Serving Los Angeles County / CSLB #1117837 / HCD #DL1611393Call 1-888-637-8238Free 48-hour lot check
All ADU services

New build

Detached ADUAttached ADUTwo-Story ADUPrefab / Modular ADUCasita / Granny Flat

Conversions

Garage ConversionJunior ADU (JADU)ADU Above GarageUnpermitted ADU LegalizationMultifamily ADU

Design, permits & money

Ground-Up ConstructionDesign & PermitsADU Floor PlansFinancing & ReturnsAll service areas

San Fernando Valley

Sherman OaksVan NuysNorth HollywoodStudio CityWoodland HillsEncinoNorthridge

San Gabriel Valley & east

PasadenaGlendaleBurbankSilver Lake

Westside & South Bay

Santa MonicaCulver CityInglewoodTorranceLong Beach

Guides

All guidesADU Cost in Los Angeles: What It Actually Runs in 2026California ADU Laws and What They Mean in Los AngelesSB 9 in California: Lot Splits and How They Compare to an ADUHow Long Does It Take to Build an ADU in Los Angeles?Does an ADU Increase Property Value in Los Angeles?Detached ADU vs Garage Conversion: Which Suits Your LA Lot?ADU Setback Requirements in California: The Four-Foot Rule ExplainedThe LA ADU Standard Plan Program: Pre-Approved Designs ExplainedBuilding a Hillside ADU in Los Angeles: What the Slope Really CostsADU Kitchen Requirements and Utility Rules in Los Angeles

Company

AboutContactGet a free lot check

About

ADU Contractors Built Around One Question

Most Los Angeles homeowners do not want a brochure. They want to know whether their lot takes an ADU, how big, and what it costs. We built the whole business around answering that first, for free, before anyone spends anything.

Pre-launch placeholder This page needs the real company story, the founder name, the CSLB license number, team detail and insurance information before launch. Everything below describes the operating method, which is accurate, but the identity details are placeholders.

What we do differently

The soils review and the sewer camera happen before you sign

A fixed price quoted without a soils report and a sewer camera inspection is not fixed. Expansive clay means a deeper footing. A root-invaded clay lateral means trenching to the main. Both are five-figure items and both are knowable in week one. We do that work first and price the foundation and the utility line from the actual findings, which usually produces a higher number than the competing quote and a more honest one.

Payments track inspections, not the calendar

Every draw is tied to a passed LADBS inspection. If the framing has not been signed off, the framing draw is not due. It aligns our interest with yours on the one thing that matters most, which is momentum.

You never talk to a plan checker

We file the submittal, track it, and clear every correction cycle. Owners who self-manage permits routinely lose two to three months, because corrections come back in code language and each reply cycle costs weeks.

How a project runs

HOW A PROJECT RUNS / FIRST CALL TO CERTIFICATE OF OCCUPANCYLot check48 hours, freeSite visit + feasibilityweek 1Design + engineeringweeks 2 to 6LADBS plan checkmonths 2 to 5Constructionmonths 5 to 11Final sign-offclosing weekHOW A PROJECT RUNS / FIRST CALL TO CERTIFICATE OF OCCUPANCY
How a Los Angeles ADU project runs from first call to certificate of occupancy.
01

Lot check

48 hours, free

You send the address. We pull the parcel, the zoning, the setbacks and the overlays, and tell you what size ADU actually fits and what it will roughly cost. No site visit needed and no obligation.

02

Site visit and feasibility

Week 1

We walk the lot, find the sewer lateral and the electrical service, check crane and equipment access, and confirm ceiling heights on any structure you want to convert. You get a written feasibility report.

03

Design and engineering

Weeks 2 to 6

Full architectural set, structural calculations, Title 24 energy compliance. You approve the layout and the elevations before anything is filed. This is where changes are cheap.

04

LADBS plan check

Months 2 to 5

We file, we track, and we clear every correction cycle. You do not talk to a plan checker. Expect four to eight weeks for the first response and one to two correction cycles after it.

05

Construction

Months 5 to 11

Eight inspected stages from footing to final. One superintendent on site daily, a weekly photo log, and a written schedule update every Friday. Payments are tied to passed inspections, not calendar dates.

06

Final sign-off and handover

Closing week

Certificate of occupancy, a separate mailing address, all warranty documentation, appliance manuals and the as-built set. If you are renting it, we hand over photos sized for the listing.

What we will tell you not to do

  • Do not convert a garage with under 7 ft 6 in of clear height without pricing the roof raise first
  • Do not build unpermitted. It adds far less value and creates a disclosure problem at sale
  • Do not order a prefab module before the crane access study is done
  • Do not spend the budget on finishes. Spend it on laundry, acoustics and a private entrance
  • Do not start design before the sewer lateral has been camera inspected

Free 48-hour lot check

The easiest way to find out if we are a fit.

No site visit needed. We answer within 48 hours. Or call 1-888-637-8238.

Start with the free lot check.

It costs nothing and it is the fastest way to find out whether this is worth pursuing at all.