Serving Los Angeles County / CSLB #1117837 / HCD #DL1611393Call 1-888-637-8238Free 48-hour lot check
All ADU services

New build

Detached ADUAttached ADUTwo-Story ADUPrefab / Modular ADUCasita / Granny Flat

Conversions

Garage ConversionJunior ADU (JADU)ADU Above GarageUnpermitted ADU LegalizationMultifamily ADU

Design, permits & money

Ground-Up ConstructionDesign & PermitsADU Floor PlansFinancing & ReturnsAll service areas

San Fernando Valley

Sherman OaksVan NuysNorth Hollywood

San Gabriel Valley & east

PasadenaGlendaleBurbank

Westside & South Bay

Santa MonicaTorranceLong Beach

Guides

All guidesADU Cost in Los Angeles: What It Actually Runs in 2026California ADU Laws and What They Mean in Los AngelesSB 9 in California: Lot Splits and How They Compare to an ADUHow Long Does It Take to Build an ADU in Los Angeles?

Company

AboutContactGet a free lot check

ADU contractors / Los Angeles County

ADU Contractors, Los Angeles: what actually fits on your lot.

Building an ADU in Los Angeles starts with one question: what does your parcel actually allow? Send us the address and nothing else. Within 48 hours you get the maximum ADU size your parcel allows, which type suits it, and a realistic cost band. No site visit, no sales call, no obligation.

Detached, attached, garage conversion, JADU and prefab.
LADBS plan check handled end to end / Fixed price off the permitted set / Payments tied to passed inspections

Where an ADU fits on a typical Los Angeles lotLOT 6,500 SQ FT / R1 / LOS ANGELESSTREETEXISTING HOUSE1,450 sq ftDRIVEREAR YARDN030 ftNEW DETACHED ADU780 sq ft1 bed, 1 bath4 ft26 ft30 ft4 FT REAR + SIDESETBACKSNO PARKING REQUIREDNEAR TRANSITGARAGE CONVERSION420 sq ftstudio, existing shell22 ftEXISTING FOOTPRINTNO SETBACK APPROVALNO REPLACEMENTPARKING REQUIREDATTACHED ADU600 sq ft1 bed, shares one wallSHARED WALL, 1-HOUR RATED24 ftENTRYUP TO 50% OF THEMAIN HOUSE AREAINDEPENDENTEXTERIOR ENTRANCE

Detached ADU, 780 sq ft, set four feet off the side and rear property lines. This is what fits on the majority of Los Angeles lots.

Licensed & bonded
CSLB 1117837HCD #DL1611393, verify at cslb.ca.gov
Custom ADU timeline
8 to 10 moNine signature site-built styles
Prefab ADUs from
$115,000Delivered fully assembled
Profit to housing
10%Of all profits go to housing the homeless
Laneway house behind a street-facing home
A detached unit built behind the main house, the most common ADU layout. Photo: SqueakyMarmot, CC BY-SA 2.0 via Flickr

Six ways to add a unit

ADU builders in Los Angeles for every lot condition

Which one is right depends on your lot geometry, your existing structures and what you want the unit to do. Every page below carries the real cost band, the size limit and the timeline, not a brochure version of it.

Detached

Detached ADU

Typical 750 sq ft detached unit: $300,000 to $450,000 all-in, by style

$400 to $600 per sq ft
Garage conversion

Garage Conversion

Conversion pricing depends on slab, height and utilities. Quoted from the site visit.

Priced after site assessment
Attached

Attached ADU

Typical 600 sq ft attached unit: $240,000 to $360,000 all-in

$400 to $600 per sq ft
JADU

Junior ADU (JADU)

JADU cost is driven by the existing plumbing wall and egress. Quoted from the site visit.

Priced after site assessment
Ground-up

Ground-Up Construction

Traditional style at the low end, Modern at the high end

$400 to $600 per sq ft
Floor plans

ADU Floor Plans

Standard plan sets save roughly $6,000 and 6 weeks of plan check

Included in design
Prefab

Prefab / Modular ADU

Nest 200 sq ft $115k / Nest One 500 sq ft $263k / Nest Two 638 sq ft $317k

From $115,000
Design & permits

Design & Permits

Design, engineering and city fees for a typical detached unit

$14,000 to $26,000
Financing

Financing & Returns

Most LA clients fund with a renovation loan or a HELOC

Varies
Casita

Casita / Granny Flat

Typical 600 sq ft casita: $240,000 to $360,000 all-in

$400 to $600 per sq ft
Two-story

Two-Story ADU

Typical 1,000 sq ft two-story unit: $450,000 to $650,000 all-in

$450 to $650 per sq ft
Above garage

ADU Above Garage

Typical 550 sq ft unit over a 2-car garage: $250,000 to $360,000 all-in

$450 to $650 per sq ft
Legalization

Unpermitted ADU Legalization

Legalization cost depends entirely on what has to be opened up. Quoted after inspection.

Priced after inspection
Multifamily

Multifamily ADU

New detached units. Conversions of existing non-habitable space price lower.

$400 to $600 per sq ft

Where the money goes

What an ADU costs in Los Angeles, without the vagueness

Prefab units start at $115,000 for the 200 sq ft Nest. Custom site-built runs $400 per square foot for Traditional up to $600 for Modern. Conversions are priced after a site assessment, because the slab, the ceiling height and the utilities decide the number. The four things that quietly blow LA budgets are the electrical service upgrade, the sewer lateral, the soil report and site access, and all four can be checked before you sign anything.

Where $240,000 goes on a 750 sq ft detached ADU in Los Angeles.
Where $240,000 goes on a 750 sq ft detached ADU in Los Angeles.

Read the full LA cost breakdown

How a project runs

Six stages, and you only have to make decisions in two of them

The order matters here, which is why it is numbered. You approve the design and you approve the finishes. We handle the parcel research, the plan check corrections, the subcontractor sequence and every inspection.

01

Lot check

48 hours, free

You send the address. We pull the parcel, the zoning, the setbacks and the overlays, and tell you what size ADU actually fits and what it will roughly cost. No site visit needed and no obligation.

02

Site visit and feasibility

Week 1

We walk the lot, find the sewer lateral and the electrical service, check crane and equipment access, and confirm ceiling heights on any structure you want to convert. You get a written feasibility report.

03

Design and engineering

Weeks 2 to 6

Full architectural set, structural calculations, Title 24 energy compliance. You approve the layout and the elevations before anything is filed. This is where changes are cheap.

04

LADBS plan check

Months 2 to 5

We file, we track, and we clear every correction cycle. You do not talk to a plan checker. Expect four to eight weeks for the first response and one to two correction cycles after it.

05

Construction

Months 5 to 11

Eight inspected stages from footing to final. One superintendent on site daily, a weekly photo log, and a written schedule update every Friday. Payments are tied to passed inspections, not calendar dates.

06

Final sign-off and handover

Closing week

Certificate of occupancy, a separate mailing address, all warranty documentation, appliance manuals and the as-built set. If you are renting it, we hand over photos sized for the listing.

Service area

Where we build across Los Angeles County

Every jurisdiction here permits differently. Pasadena, Glendale, Burbank, Santa Monica, Long Beach and Torrance all run their own building departments rather than LADBS, and the local overlays change what is buildable.

See every area we cover

On the map

ADU builders in Los Angeles, working across the county

From the Valley flats to the South Bay. Every jurisdiction on this map permits differently, and we run projects through all of them: LADBS in the city, and the independent building departments in Pasadena, Glendale, Burbank, Santa Monica, Long Beach and Torrance. If you got here searching for ADU builders near me, this map is the honest answer to what "near" covers.

Questions

ADU questions Los Angeles homeowners actually ask

What is the cheapest way to add an ADU in Los Angeles?

Converting an existing garage. The shell, slab and roof already exist, so you pay for utilities, insulation, windows and finishes rather than a whole new structure. Prefab is the next cheapest at $115,000 for the 200 sq ft Nest. A custom detached build costs the most and returns the most.

How soon can construction actually start?

Design and engineering take four to six weeks, then LADBS plan check runs two to five months depending on correction cycles. Realistically the first footing goes in around month five. Using an LADBS pre-approved standard plan removes roughly six weeks from that.

What would stop an ADU from working on my lot?

Rarely the zoning, usually the physical lot. Slope, a protected tree, fire department access width, an undersized electrical service or a sewer lateral in the wrong place are the real blockers. All five get checked during the free 48-hour lot check before you spend anything.

Will I lose my driveway or garage space?

Not for a garage conversion, since the city cannot ask you to replace parking you convert. For a new detached unit, most Los Angeles parcels sit within half a mile of a transit stop and are exempt from adding parking at all. Your driveway stays as it is.

All questions

Free 48-hour lot check

Send the address. We do the parcel research and tell you what fits.

No site visit needed. We answer within 48 hours. Or call 1-888-637-8238.

Your lot either takes an ADU or it does not. Find out for free.

We pull the zoning, setbacks and overlays and give you a straight answer within 48 hours. There is no site visit and no obligation.

Call nowFree lot check