Serving Los Angeles County / CSLB #1117837 / HCD #DL1611393Call 1-888-637-8238Free 48-hour lot check
All ADU services

New build

Detached ADUAttached ADUTwo-Story ADUPrefab / Modular ADUCasita / Granny Flat

Conversions

Garage ConversionJunior ADU (JADU)ADU Above GarageUnpermitted ADU LegalizationMultifamily ADU

Design, permits & money

Ground-Up ConstructionDesign & PermitsADU Floor PlansFinancing & ReturnsAll service areas

San Fernando Valley

Sherman OaksVan NuysNorth Hollywood

San Gabriel Valley & east

PasadenaGlendaleBurbank

Westside & South Bay

Santa MonicaTorranceLong Beach

Guides

All guidesADU Cost in Los Angeles: What It Actually Runs in 2026California ADU Laws and What They Mean in Los AngelesSB 9 in California: Lot Splits and How They Compare to an ADUHow Long Does It Take to Build an ADU in Los Angeles?

Company

AboutContactGet a free lot check

Service area / Woodland Hills, CA

ADU Woodland Hills: What Your Lot Allows

Planning an ADU in Woodland Hills? Start with the lot, not the floor plan. ADU builders in Woodland Hills get some of the largest lots in the city, and some of the hottest summer cooling loads to design around.

  • 91364
  • 91367
  • 91371

The short answer

Woodland Hills has the largest average lot size of any ADU submarket covered here, which means a detached unit at or near the 1,200 sq ft state maximum is genuinely achievable. The tradeoffs are extreme summer heat on the western Valley floor and Santa Monica Mountains fire zone designations on the southern parcels. LADBS permitting.

San Fernando Valley view toward Woodland Hills
The west San Fernando Valley, home to Woodland Hills. Photo: Oakshade, CC BY-SA 3.0 via Wikimedia Commons

Free lot check in Woodland Hills

Send the address. Written answer within 48 hours, no site visit.

No site visit needed. We answer within 48 hours. Or call 1-888-637-8238.

Woodland Hills has the largest average lot sizes on this list, with Walnut Acres parcels running 15,000 sq ft and more. That opens options most of Los Angeles never sees: full 1,200 sq ft detached units with yard to spare, and the JADU-plus-ADU stack without crowding anything. It is also the hottest part of the city in summer, and an ADU built here without a serious cooling strategy is a complaint waiting to happen.

Large lots put a 1,200 sq ft unit on the table

Walnut Acres and College Acres run 12,000 to 20,000 sq ft parcels. A maximum-size 1,200 sq ft two-bedroom fits with room left over, and many owners here build the full stack: JADU in the house, detached ADU behind it, three addresses on one parcel.

Across most of Los Angeles the state maximum for a detached ADU is theoretical, because the setbacks and the existing house consume the lot before you get there. In Woodland Hills, particularly north of Ventura and west of Winnetka, 9,000 to 12,000 sq ft lots are common and a genuine two-bedroom two-bathroom unit at 1,100 to 1,200 sq ft fits with yard left over. That changes the underwriting entirely: you are building a house, not a studio.

One-bedrooms underwrite around $2,300 to $2,800, two-bedrooms $3,000 to $3,600. Warner Center employment and the larger unit sizes make two-bedrooms a stronger play here than in most of the Valley.

Designing for 105-degree afternoons

Woodland Hills regularly posts the highest temperatures in Los Angeles County. West-facing glazing, deep overhangs, cool roofs and a heat pump sized for design-day heat, not average heat, are the difference between a rentable unit and one that cooks. We size for the 100-degree week.

The western Valley floor is the hottest part of the county, routinely 15 degrees above the Westside in August. An ADU here needs a west elevation that is treated seriously: deep overhangs, minimal or shaded west glazing, low solar heat gain coefficient windows, a radiant barrier and a correctly sized heat pump. Undersizing the mechanical system is the single most common comfort complaint we get called about in this part of the Valley, and it is far cheaper to size it right than to replace it.

Slope lots south of the Boulevard

Between Ventura and Mulholland the grade picks up, and with it the hillside review. North of the boulevard and around Warner Center, topography is a non-issue.

Large Woodland Hills lots suit a full-size detached ADU or a casita, and slope parcels follow the hillside ADU process. Funding a larger unit is covered in ADU financing.

Warner Center, Walnut Acres, Carlton Terrace and College Acres

  • Warner Center area
  • Carlton Terrace
  • South of the Boulevard
  • Walnut Acres
  • College Acres
  • Woodland Hills Country Club area

ZIP codes: 91364, 91367, 91371

Local reference points: Warner Center, Topanga Canyon Boulevard, Westfield Topanga, Pierce College, Serrania Park and Ventura Boulevard west.

Permitting for Woodland Hills runs through LADBS (City of Los Angeles).

Woodland Hills ADU questions on size, fire zones and heat

How big an ADU can I build in Woodland Hills?

Up to the 1,200 sq ft state maximum on many parcels, which is unusual. Woodland Hills lots north of Ventura and west of Winnetka commonly run 9,000 to 12,000 sq ft, leaving room for a genuine two-bedroom unit inside the setbacks.

Is my Woodland Hills property in a fire zone?

Parcels on the southern edge bordering the Santa Monica Mountains are frequently designated very high fire hazard severity zones, requiring ignition-resistant construction. The Valley floor north of Ventura generally is not.

Does the heat affect ADU design in Woodland Hills?

It should. The western Valley floor runs materially hotter than the rest of the county, so the west elevation needs deep overhangs, shaded glazing and a properly sized heat pump. Undersizing the system is the most common comfort complaint here.

What do Woodland Hills ADUs rent for?

One-bedroom units typically underwrite around $2,200 to $2,700, and larger two-bedroom units around $2,900 to $3,700. Warner Center employment supports steady demand.

How much does a 1,200 sq ft ADU cost in Woodland Hills?

Roughly $480,000 to $720,000 all-in at $400 to $600 per square foot. Larger units get slightly better shell economics, but the kitchen, bathrooms and utility work do not scale down.

Sources and official references

Every rule, limit and code reference on this page comes from the sources below. Verify anything before you sign a contract.

Building an ADU in Woodland Hills?

Send the address and we will tell you what your parcel allows within 48 hours.

Call nowFree lot check